Service / Hydroseeding
Spray it. Grow it.
Professional hydroseeding with our Finn hydroseeder trailer — new lawns, erosion control, and overseeding for homes across Ramsey and the north Twin Cities metro.

New Lawn Hydroseeding
Seed, mulch, fertilizer, and tackifier sprayed in one even pass — faster germination and more uniform coverage than broadcast seeding or hand-spread straw.
- ◆Premium seed blends matched to sun, shade, and soil
- ◆Wood or paper fiber mulch for moisture retention
- ◆Starter fertilizer mixed directly into the slurry
- ◆Uniform coverage with no bare patches or clumps
Erosion Control & Slope Seeding
Steep grades, swales, and disturbed soil need protection fast. Hydroseed bonds to the surface and holds while roots take hold underneath.
- ◆Bonded fiber matrix (BFM) options for steep slopes
- ◆Tackifier application to lock mulch in place
- ◆Ditch, swale, and pond-edge stabilization
- ◆Paired with erosion mat or blanket where needed
Overseeding & Renovation
Thin, tired lawns get a second life. We prep the surface, then spray a seed-and-fertilizer slurry that fills bare spots and thickens the stand.
- ◆Aeration or dethatching before application
- ◆Bare-spot repair and full-lawn overseeding
- ◆High-traffic and pet-damage renovation
- ◆Starter fertilizer to push establishment
Aftercare & Establishment
The spray is only half the job. We walk you through watering, mowing, and timing so the new turf comes in thick and stays that way.
- ◆Written watering schedule for the first month
- ◆First-mow timing and height guidance
- ◆Follow-up check on germination and coverage
- ◆Touch-up application if any area lags
The hydroseeding process at a glance
From bare soil to green lawn.
Day 1
Consultation
- — Site walk & soil check
- — Sun/shade assessment
- — Seed blend selection
- — Estimate & scheduling
Day 2
Prep
- — Final grade or aeration
- — Rock & debris removal
- — Soil amendment as needed
- — Surface raked smooth
Day 3
Spray
- — Slurry mixed on-site
- — Even spray application
- — Edges & beds protected
- — Cleanup before we leave
Weeks 1–6
Grow
- — Watering schedule provided
- — Germination in 7–14 days
- — First mow at 3–4 inches
- — Follow-up & touch-ups
Ready for a lawn that actually fills in?
Tell us about your new lawn, slope, or renovation project and we'll walk the site, check the soil, and quote it clearly — no upsell pressure.