Service / Hydroseeding

Spray it. Grow it.

Professional hydroseeding with our Finn hydroseeder trailer — new lawns, erosion control, and overseeding for homes across Ramsey and the north Twin Cities metro.

Tan Finn hydroseeding trailer applying hydroseed to a prepared residential lawn
01 / Spring – Fall

New Lawn Hydroseeding

Seed, mulch, fertilizer, and tackifier sprayed in one even pass — faster germination and more uniform coverage than broadcast seeding or hand-spread straw.

  • ◆Premium seed blends matched to sun, shade, and soil
  • ◆Wood or paper fiber mulch for moisture retention
  • ◆Starter fertilizer mixed directly into the slurry
  • ◆Uniform coverage with no bare patches or clumps
02 / Spring – Fall

Erosion Control & Slope Seeding

Steep grades, swales, and disturbed soil need protection fast. Hydroseed bonds to the surface and holds while roots take hold underneath.

  • ◆Bonded fiber matrix (BFM) options for steep slopes
  • ◆Tackifier application to lock mulch in place
  • ◆Ditch, swale, and pond-edge stabilization
  • ◆Paired with erosion mat or blanket where needed
03 / Late Summer – Fall

Overseeding & Renovation

Thin, tired lawns get a second life. We prep the surface, then spray a seed-and-fertilizer slurry that fills bare spots and thickens the stand.

  • ◆Aeration or dethatching before application
  • ◆Bare-spot repair and full-lawn overseeding
  • ◆High-traffic and pet-damage renovation
  • ◆Starter fertilizer to push establishment
04 / First 4–6 Weeks

Aftercare & Establishment

The spray is only half the job. We walk you through watering, mowing, and timing so the new turf comes in thick and stays that way.

  • ◆Written watering schedule for the first month
  • ◆First-mow timing and height guidance
  • ◆Follow-up check on germination and coverage
  • ◆Touch-up application if any area lags

The hydroseeding process at a glance

From bare soil to green lawn.

Day 1

Consultation

  • — Site walk & soil check
  • — Sun/shade assessment
  • — Seed blend selection
  • — Estimate & scheduling

Day 2

Prep

  • — Final grade or aeration
  • — Rock & debris removal
  • — Soil amendment as needed
  • — Surface raked smooth

Day 3

Spray

  • — Slurry mixed on-site
  • — Even spray application
  • — Edges & beds protected
  • — Cleanup before we leave

Weeks 1–6

Grow

  • — Watering schedule provided
  • — Germination in 7–14 days
  • — First mow at 3–4 inches
  • — Follow-up & touch-ups

Ready for a lawn that actually fills in?

Tell us about your new lawn, slope, or renovation project and we'll walk the site, check the soil, and quote it clearly — no upsell pressure.